1016 Seamount Way                     #200-1140 West Pender St

Gibsons, BC  V0N 1V7                    Vancouver, BC  V6E 4G1

Tailings Pipeline Sand Stacker

Tailings Pipeline Sand Stacker

MG worked with Pipeline Systems Inc. (Concord, CA) to provide process, mechanical, and civil engineering for a conceptual study on a medium distance (5 km) tailings pipeline and a hydrocyclone system to produce low water content sand suitable for construction of tailings impoundment berms at the Albian Oil Sands. The study included both the option of a centrally located hydrocyclone station with sand distribution pipelines and on-berm cycloning with movable towers.

The work included: routing of the whole tailings pipeline, sizing of the pipeline, sizing of the pumps/motors, identification of potential locations for the central hydrocyclone station, selection of the cyclones, sizing of the sand pipelines and pumps/motors, and design of the overflow distribution system (pipe, pumps/motors). For the movable towers, the work included: design of the towers (including the relocation method), selection of the hydrocyclones, and the overflow piping design.